Scope of Work :

S.NO PERTICULARS UNITS DETAILS
1 Pavement   MCW-Flexible
SR-Flexible
2 By Passes    
I. No of Locations  Nos 2
II. Length kms 4.180
3 Realignment    
I. No of Locations  Nos 3
II. Total Length kms 6.730
4 Built Up Area    
I. No of Locations  Nos 4
II. Total Length kms 1.69
5 Service Road    
I. No of Locations  Nos 2
II. Total Length (BHS) kms 55.760
6 Slip Road    
I. No of Locations  Nos 15
II. Total Length kms 21.92
8 ROW m 45
9 At Garde Intersections Nos 29

Structures :

S.NO DESCRIPTION UNITS DETAILS
1 Flyover Nos 2
2 VUP Nos 9
3 LVUP Nos 3
4 SVUP Nos 1
5 VOP Nos 3
6 Box Culverts    
I. Reconstruction of Box Culverts Nos 39
II. Culverts to be dismantled Nos 4
III. New Consturction Nos 23
VI. Cross Road Culverts Nos 59
7 Detais of New Construction Bridges      
I. New construction of Major Bridges Nos 4
II. New Construction of Minor Bridges Nos 3
8 Viaduct/Elevated Corridor Nos 2
9 New RUB /RUB No 1
10 Over Head Signs No 29.000
11 Minimum Length of Street Lighting kms 26.860
12 Soil Nailing kms 2.520
13 Minimum length of RCC Lined Drain kms 64.700
14 Toll Plaza Nos Nill
15 Truck Lay Bye Nos 2
16 Bus Bays with Bus Shelter Nos 30
17 Rest Areas Nos 2